Installation of sewage can be considered sufficienta difficult task, but if a person has firmly decided to do everything himself, then this is quite feasible. In this case, the important thing is the knowledge of the features of the process, so you will not face certain difficulties, but there are quite a lot of them.

Sewer installation
If you are interested in such a process as installationsewage, it is worth saying that many details are important here. First of all, you should remember that the sewerage system can be performed in four versions. The most primitive is the use of a cesspool. This method is old enough, while it has almost zero practicality by modern standards. Do not consider this option in detail, since it has exceptionally negative features.

Installation of sewerage in the house
Installation of sewerage in a private house can be doneand according to the following principle. Here it is a question of a concrete system, which includes a whole set of overflow wells. This option may not be suitable, because it is quite difficult to implement. Here it is worth noting that it will be necessary to dig out the entire site in order to make such a system. With its use, you will be forced to call the sanitizer regularly, and for this it is necessary to arrange an entrance for their machines. It is possible to install a sewage system using a plastic, fiberglass or metal septic tank, mounted using filtration fields. In this case, the disadvantage is that the filters become clogged regularly, which causes unpleasant smells to appear on the site.

Installation of sewerage in a private house
Installation of sewerage using a stationdeep cleaning can be considered the most optimal option. It's convenient and simple, you can collect it on your own site. With a low groundwater location, it is possible to organize a gravity outlet of the purified liquid. With a high flow of groundwater, you will require forced removal of water after cleaning. In addition to the groundwater level, the degree of soil permeability at the site where the system is located should also be considered.

Installation of sewage in the house begins with the fact thatthe foundation pit is prepared. The dimensions of the deep cleaning station are at least 150 * 150 * 230 centimeters. It should be placed so that the pipe for acceptance can go without obstacles. In the excavated excavation it is necessary to lower the station, and then align it. Then it needs to be filled with water, the level of which should reach the special marks. The entire station must be sprinkled with sand. The next step will be the preparation of trenches intended for pipelines. Runoff drains should be located with a gradient of 2 degrees. The station requires electric power for its work. The cable must be laid in a plastic pipe to protect it to the maximum.

At this the installation of sewerage is completed, it remains only to enjoy this benefit of civilization. With proper care, you can guarantee the long life of this system.